Wednesday, March 12, 2008

Tutorial Exercise 1


Footing Section

Barwon Valley Activity Centre

This Section shows a rigid connection with an infill slab. The infill slab has covered the bolts of this column, l assume that this was done for aesthetics purposes as well as safety reasons as this section is part of the Basketball courts.

Tutorial Exercise 1


Roof Section
Barwon Valley Activity Centre

Beam/Rafter are bolted at the apex, and the purlins are running perpendicular to the rafters. Also noted is the insulation which is silver in colour and the wire mash to hold it in place.

Tutorial Exercise 1


Barwon valley Activity Centre

This is the outside view of the building.
The outside has metal sheets with insulation inside of this Portal Frame